The project consists of upgrading the existing jetty no.2 to berth vessels from 2,000DWT to 80,000DWT. This jetty is originally constructed by Antara Koh (M) Sdn Bhd in 1980’s to berth vessels from 2,000DWT to 40,000DWT and for handling of hazardous cargo. During the upgrading, the terminal is in full operation. The extended loading platform is supported by steel pipe piles of diameter 762mm and 36m in length and socketed into granite bedrock.
The existing piles were strengthened and jacketed with reinforced concrete. The fenders were upgraded to SUC1250H and SUC1000H. Other deck furniture are 20T and 50T bollards and rubber ladders. The mechanical and electrical scope of works includes fire protection and hydrant system, fresh water supply lines for bunkering, fire alarm and detection system and explosion proof lighting system
Reinforced concrete works and piling activity working concurrently | ||
JSuccessful completion of 300-ton jumbo reel carrier approach bridge | ||
Installation of arc shape design catwalk trestle | ||
Completion of jetty head connected with extension jetty | Precast concrete fender panel for the SUC-1600 fender to contact the pneumatic fender at “Deep Blue” & “Venturer” vessels during berthing. | |
Back to top | ||